https://newsletter.mw.creamermedia.com
Conveyors|Crushing|Financial|Infrastructure|Mining|PROJECT|rail|Surface|Underground|Waste|Water|Equipment|Infrastructure|Waste
Conveyors|Crushing|Financial|Infrastructure|Mining|PROJECT|rail|Surface|Underground|Waste|Water|Equipment|Infrastructure|Waste
conveyors|crushing|financial|infrastructure|mining|project|rail|surface|underground|waste-company|water|equipment|infrastructure|waste

Ohmgebirge potash development, Germany

Image of potash ore by Bloomberg

Photo by ©Bloomberg

28th June 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ohmgebirge potash development.

Location
North-western extent of the South Harz sedimentary basin, about 30 km west of Sondershausen and 65 km north-west of the state capital, Erfurt, in Germany.

Project Owner/s
South Harz Potash.

Project Description
Ohmgebirge has an ore reserve of 83.1-million tonnes at 12.6% potassium oxide comprising 92% of the prefeasibility study (PFS) mine and process schedule.

The PFS has demonstrated the technical and financial robustness of an existing shaft-access, underground mining operation, with a conventional cold-water leach and hot crystallisation process producing 930 000 t/y of premium muriate of potash (MoP), with total life-of-mine (LoM) production of 17.6-million tonnes. Peak MoP output is forecast at one-million tonnes a year in select higher ore-grade years.

The LoM schedule comprises total ore production of 90.1-million tonnes at an average diluted potassium oxide grade of 12.5% over an initial 19-year mine life.

Average throughput is estimated at 4.7-million tonnes a year.

Personnel and equipment access to the Ohmgebirge deposit will be through the currently operating Bernterode No 1 shaft. 

Requisite operating ventilation will be achieved using the Bernterode No 1 and Sollstedt 
shafts.

The crushing and dissolving process infrastructure will be positioned underground (in existing Sollstedt Haynrode mine voids), with the brine pumped to surface, and the evaporation process infrastructure being located proximate to the rail load-out area. 

Process residue will be treated through the underground backfill plant before being transferred and placed into existing Haynrode and future Ohmgebirge mine voids.

The mine plan for the Ohmgebirge involves a combination of continuous mining and conventional drill-and-blast methods, tailored to the geological characteristics of the deposit.

Continuous miners are proposed for chevron-style panels in areas with low seam gradients and limited thickness, while benching in production wings is considered for thicker seams.

Conventional drill-and-blast methods are intended for square room-and-pillar mining blocks in areas with higher seam thickness and gradients, with ore haulage facilitated by a combination of equipment, including mobile conveyors; loaders, haulers and dumpers; and fixed conveyors. 

Mined material is transported to the underground crushers using fixed conveyors, and mined-out panels are backfilled hydraulically with waste material.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project’s pretax, real basis, ungeared net present value is estimated at $1.03-billion, at an 8% discount rate, and its internal rate of return at 17.8%.

Capital Expenditure
Preproduction capital expenditure is estimated at $1.15-billion.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
South Harz Potash, tel +61 408 447 493 or email info@southharzpotash.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

 

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.185 0.326s - 166pq - 2rq
Subscribe Now