https://newsletter.mw.creamermedia.com
Coal|Components|Construction|Copper|Mining|Power|Refining|Solar|Underground
Coal|Components|Construction|Copper|Mining|Power|Refining|Solar|Underground
coal|components|construction|copper|mining|power|refining|solar|underground

Rio Tinto approves 25 MW solar plant for US copper mine

14th November 2024

By: Creamer Media Reporter

     

Font size: - +

Mining company Rio Tinto has approved construction of a new 25-MW solar plant at its Kennecott copper operation in Utah, bringing the mine’s total solar capacity to 30 MW.

The new solar plant will be located next to Kennecott’s existing 5 MW solar plant, which was completed in 2023. Together, the two solar plants will reduce Kennecott’s Scope 2 emissions by about 6%, or 21 000 t/y of CO2 equivalent.

“Expanding our solar farm is the latest step in our journey to reduce our carbon footprint. Together with other measures we’ve taken, such as closing a coal-fired power plant, deploying battery electric vehicles underground, and our recent transition to renewable diesel, we have reduced our emissions by millions of tons over the past few years,” said Rio Tinto Kennecott MD Nate Foster.

Kennecott, which already has one of the lowest carbon footprints of any copper producer in the US, has reduced its carbon footprint more than 80% since 2018.

The new solar array will include more than 71 000 panels, which contain tellurium produced by Kennecott, a byproduct of mining and refining copper. In 2022, Kennecott became one of only two US producers of this critical mineral. Both copper and tellurium are vital components of PV solar panels.

Edited by Creamer Media Reporter

Comments

Showroom

Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 
SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.128s - 126pq - 2rq
Subscribe Now