https://newsletter.mw.creamermedia.com
Africa|Botswana|Diamonds|Energy|Exploration|Mining|Pipe|PROJECT|Resources|Systems|Environmental|Pipe
Africa|Botswana|Diamonds|Energy|Exploration|Mining|Pipe|PROJECT|Resources|Systems|Environmental|Pipe
africa|botswana|diamonds|energy|exploration|mining|pipe-company|project|resources|systems|environmental|pipe

Thorny River diamond dyke project, South Africa – update

Image of Thorny River diamonds 2018

Photo by Botswana Diamonds

6th December 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Thorny River diamond dyke project.

Location
The project is a consolidation of the Frischgewaagt, Hartbeesfontein and Doornrivier properties, in Limpopo, South Africa.

Project Owner/s
Diamond exploration and project development company Botswana Diamonds (BOD).

Project Description
Thorny River comprises the eastern extension of the kimberlite dyke and/or pipe systems on which the Klipspringer and Marsfontein mines are located, both of which have been economically mined.

The project has a modelled in situ grade range of 46 carats per hundred tonnes (cpht) to 74 cpht, and a diamond value range of $120/ct to $220/ct.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Production at Thorny River is expected to start in the second half of 2023.

Latest Developments
South Africa’s Department of Mineral Resources and Energy has approved the environmental authorisation for one of two mining permit applications submitted by Botswana Diamonds on the Thorny River project.

The diamond exploration company notes that, following further community consultation, a mining permit should be granted within six weeks.
 
Key Contracts, Suppliers and Consultants

None stated.

Contact Details for Project Information
BOD, tel +353 1 833 2833/+353 1 833 2833, fax +353 1 833 3505 or email info@botswanadiamonds.co.uk.

Edited by Creamer Media Reporter

Comments

Showroom

John Ratcliffe
John Ratcliffe

At John Ratcliffe, we are aftermarket specialists for heavy-duty on and off-road vehicles. We engineer and retrofit advanced safety systems, engine...

VISIT SHOWROOM 
Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 21 February 2025
Magazine round up | 21 February 2025
21st February 2025
BOLSTERING PRESENCE
The project is set to bolster Namibia’s position as one of the world’s leading uranium producers
Uranium mine moving closer to production
21st February 2025 By: Simone Liedtke

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.051 0.185s - 129pq - 2rq
Subscribe Now