Name of the Project
Tombador iron-ore project.

Location
Municipality of Sento Sé, in northern Bahia State, Brazil.

Project Owner/s
Tombador Iron Mineração, a subsidiary Tombador Iron.

Project Description
A prefeasibility study (PFS) has confirmed the potential for the project to produce a high-grade product and generate strong returns over its life-of-mine.

The PFS is based on an independent Joint Ore Reserves Committee 2012-compliant mineral resource of only the high-grade hematite within the Tombador tenement comprising 8.92-million tonnes at 64.4% iron of high-grade hematite using a cutoff grade of 55% iron.

The PFS shows a maiden ore reserve of 5.59-million tonnes at 65.5% iron, which underpins 100% of the forecast production of 1.2-million tonnes a year of direct shipping ore over a five-year mine life.

The proposed mining operation consists of a single openpit mine using conventional drill-blast, excavator-truck mining methods.

Ore will be processed through a three-stage crushing and screening plant to produce a direct shipping ore lump (+6.3 mm/-31.5 mm) and fines (-6.3 mm) product.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a payback period of 1.2 years from initial investment.

Capital Expenditure
Preproduction capital costs are estimated at A$7.9-million.

Planned Start/End Date
None stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
GE21 Consultoria Mineral (mineral resources and reserves estimates).

Contact Details for Project Information
Tombador Iron, tel +61 8 6382 1805 or email info@tombadoriron.com.

Edited by Creamer Media Reporter

Comments

Showroom

John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.077 0.212s - 127pq - 2rq
Subscribe Now