Project Description
The Warrawoona project is a high-margin gold operation, with average gold production estimated at 90 000 oz/y over an initial eight-year mine life.
The project includes a two-million-tonne-a-year conventional carbon-in-leach processing circuit with a single-stage crushing and semiautogenous grinding mill
Calidus’ acquisition of the high-grade Blue Spec mine provides immediate opportunity to expand production and free cash flow at the Warrawoona gold project. The definitive feasibility study and integration plan are being undertaken in parallel with the construction of Warrawoona.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $408-million and an internal rate of return of 81%, with a payback of 13 months.
Capital Expenditure
The project has a capital cost of $120-million, including contingency and preproduction mining costs.
Planned Start/End Date
The project is expected to pour first gold in the first half of 2022.
Latest Developments
Calidus Resources has signed an agreement with Zenith Pacific for the construction of a 4 MW solar farm with 3.5 MW battery energy storage system at its Warrawoona gold project.
Zenith is constructing the 11 MW gas-fired power station at Warrawoona under a power purchase agreement (PPA). The construction of the solar farm is part of the PPA whereby Calidus buys power from Zenith.
The solar farm will be built in the second half of 2022 and will feed into the distribution line between the power station and accommodation village.
The decision to proceed with the solar farm and battery storage is in line with the company’s environmental, social and governance (ESG) initiatives, Calidus MD Dave Reeves has said.
“Calidus is committed to carbon reduction as part of its ESG policy. This renewable microgrid is a cornerstone of our carbon reduction plan, which includes the use of liquefied natural gas (LNG), not diesel, and the ability of the LNG gensets to use up to 25% hydrogen. We are pleased to extend the relationship with Zenith to incorporate this renewables project, and look forward to its construction in the second half of this year,” he has noted.
Key Contracts, Suppliers and Consultants
Optiro Consultants, Lynn Widenbar and Associates (mineral resource estimate); Rapallo, Biologic, Woodman, Sticks and Stones, Total Heritage, Nyamal Heritage, Bat Call, Graeme Campbell and Associates, Mine Earth, Lloyd George Acoustics (environmental, base line studies and project permitting); Peter O’Bryan and Associates, ATC Williams (geotechnical); ATC Williams (tailings storage facility); Groundwater Resource Management, or GRES (hydrology and hydrogeology); GR Engineering Services (processing plant); GRES, Metallurgy Management Services, Nagrom, ALS, BV (metallurgy and testwork); GRES, Aerodrome Management Services (infrastructure); Intermine Engineering Consultants, Entech and Galt Mining (mining); Macmahon Holdings (openpit mining and tailings dam); GRES (process plant engineering, procurement and construction contract); Rangecon (village install); and Telstra (communication).
Contact Details for Project Information
Calidus Resources, email info@calidus.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation