https://newsletter.mw.creamermedia.com
Africa|Business|Construction|Consulting|Contractor|drives|Gold|Hydropower|Industrial|Infrastructure|Mining|Power|PROJECT|Resources|System|Systems|Underground|Equipment|Drilling|Infrastructure
Africa|Business|Construction|Consulting|Contractor|drives|Gold|Hydropower|Industrial|Infrastructure|Mining|Power|PROJECT|Resources|System|Systems|Underground|Equipment|Drilling|Infrastructure
africa|business|construction|consulting-company|contractor|drives|gold|hydropower|industrial|infrastructure|mining|power|project|resources|system|systems|underground|equipment|drilling|infrastructure

Witwatersrand Basin Project – Qala Shallows, South Africa – update

Aerial view of Qala Shallows portal

Photo by West Wits Mining

12th September 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Witwatersrand Basin Project (WBP) – Qala Shallows.

Location
The project is situated about 15 km west of the Johannesburg central business district, in South Africa's Gauteng province.

Project Owner/s
Explorer, developer and producer of high-value precious and base metals West Wits Mining.

Project Description
Qala Shallows is an integral part of the WBP. An updated definitive feasibility study (DFS), released on July 23, 2025, highlights improved results and reinforces the project's robust value and strong economic fundamentals. 

The reefs to be processed during the life of the project are the Kimberley reefs – K9A and K9B.

The total Joint Ore Reserves Committee- (Jorc-) compliant mineral reserves are estimated at 4.6-million tonnes grading at 2.60 g/t for 383 934 oz of gold. The total Jorc-compliant mineral resources for the K9A reef are estimated at 8.1-million tonnes grading at 4.8 g/t gold for 1.2-million ounces of gold, and 10.5-million tonnes at 4.5 g/t gold for 1.5-million ounces of gold for the K9B reef.

The mine plan has been optimised with a lower cutoff grade of 1.31 g/t (reduced from 2 g/t in 2023), allowing for the inclusion of additional ore and accelerating the production profile. The project uses a conventional breast mining method in an underhand configuration, considered optimal for the Qala Shallows deposit. 

The stopes will be accessed by strike drives developed on the K9B reef horizon and K9A and K9B stopes will be accessed from this infrastructure. The strike drives will connect to a decline system developed from the existing Qala adit boxcut, located centrally in the mining area and in the footwall of the K9B reef.

Steady-state gold production is estimated at 70 000 oz/y over a 12-year period, an increase from nine years in the 2023 DFS. 

Total gold production over the 16.8-year life-of-mine is projected at 944 000 oz, up from 924 000 oz over 17.7 years in the 2023 DFS. The maximum production rate is estimated at 860 000 t/y (2023 DFS: 839 000 t/y), with an average gold production of 56 000 oz/y (2023 DFS: 51 000 oz) and peak production of 75 000 oz in Year 6. The total run-of-mine tonnes are estimated at 10.7-million (2023 DFS: 10.2-million tonnes).

Ore processing will be conducted at the Ezulwini process plant, a subsidiary of Sibanye-Stillwater, on a toll treatment basis. The plant uses carbon-in-pulp for gold recovery. 

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The updated DFS shows a pretax net present value, at a7.5% discount rate, of $719-million (compared with $367-million in 2023) and an internal rate of return of 93% (compared with 61% in 2023). Payback from the end of the peak funding period is estimated at eight months and at 3.3 years from the start of development.

Capital Expenditure
Peak funding is estimated at $44-million over a 2.6-year period, a reduction from $54-million over three years in the 2023 DFS.

Planned Start/End Date
The first gold pour at Qala Shallows is slated for the first quarter 2026.

Latest Developments
West Wits has secured Investment Committee approval from Nebari Natural Resources Credit Fund II LP for a $12.5-million loan facility to advance Qala Shallows. 

The funding will support mobilisation and project execution ahead of its first gold pour in 2026. Loan documents are being finalised, and the facility is structured to safeguard shareholder value while retaining the option to access an additional R875-million South African bank facility.

The agreement allows for two further tranches of funding – $12.5-million and $10-million – bringing the total potential facility to $35-million, subject to additional approvals and conditions. 

Proceeds will be strictly applied to the development of Qala Shallows.

Mobilisation at the project is under way, with underground mining equipment under construction and scheduled for delivery in late 2025. Hydropower drilling systems and power packs have been commissioned to accelerate decline development, supported by geotechnical drilling to confirm ground conditions. Once operational, the project is expected to ramp up to a steady-state production rate of 65 000 t a month.

Key Contracts, Suppliers and Consultants
Bara Consulting (independent mining engineers, undertaking the DFS review and update); Modi Mining (mining contractor); Industrial Development Corporation of South Africa and Absa Bank (lenders for the syndicated loan facility); and Sibanye-Stillwater's Ezulwini process plant facility (toll treatment agreement for ore processing).

Contact Details for Project Information
West Wits Mining, tel +61 3 8692 9049 or email info@westwitsmining.com.

Edited by Creamer Media Reporter

Comments

Research Reports

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Carlisle TyrFil
Carlisle TyrFil

Flatproofing tire technology engineered to perform in extreme mining environments.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 12 September 2025
Magazine round up | 12 September 2025
12th September 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.065 0.196s - 129pq - 2rq
Subscribe Now