Ecuador starts to shut down oil drilling on nature reserve
QUITO - The Ecuadorean government on Wednesday began the process of shuttering oil wells in the 43-ITT block, located on a vast nature reserve, after voters last year backed a referendum to end drilling in the area on environmental concerns.
The energy ministry said in a statement it closed one of the 247 wells in the block, the Ishpingo B-56well, part of a plan expected to take around five-and-a-half years.
The nation's constitutional court ruled last year that state-owned Petroecuador had one year to remove infrastructure at the block, though authorities have said progress will take much longer.
"Complying with the closure of ITT is not an easy job, it requires special and technical planning," energy minister Antonio Goncalves said in the statement.
Petroecuador has pumped around 50 000 barrels per day (bpd) at 43-ITT since operations began in 2016. Total crude production in the nation is around 480 000 bpd, according to official data.
The cost of ending oil drilling at the block will top $1.3-billion, according to a government estimate submitted to the constitutional court.
The seven Indigenous communities who live on the Yasuni reserve, the largest in Ecuador's Amazon rainforest, will also stop receiving the legally mandated funds from Petroecuador for drilling at the site.
The wells should all go offline by December 2029, the government has said, but removing all the infrastructure at the block could take until August 2030.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation