Iron Bridge magnetite project – Stage 2, Australia – update
Photo by Fortescue Metals Group
Name of the Project
Iron Bridge magnetite project – Stage 2.
Location
The project is located 145 km south of Port Hedland, in Pilbara, Western Australia.
Project Owner/s
An unincorporated joint venture (JV) between Fortescue Metals Group (FMG) subsidiary FMG Iron Bridge, or FMG IB, (69%), and Formosa Steel (31%).
FMG will manage and operate the project with full marketing rights.
Project Description
The project has a mineral resource of 5.45-billion tonnes, including an ore reserve of 716-million tonnes and a mine life of more than 20 years.
The Stage 2 development follows the $500-million investment in the successful Stage 1 construction of large-scale pilot and demonstration plants, which have validated key equipment and magnetite production processes for the full-scale Stage 2 ore-processing facility.
Stage 2 development includes:
- a 22-million-wet-metric-tonne-a-year ore processing facility (once at full operational capacity);
- an airstrip and expanded village;
- a 195 km canning basin water pipeline;
- a 135 km concentrate pipeline to FMG’s Herb Elliot port facility, in Port Hedland, and a return process water pipeline; and
- port handling facilities, including concentrate dewatering, covered storage and reclaiming/conveying, to existing port outload circuits.
The project aims to produce 22-million wet metric tonnes a year once full operational capacity is achieved. Iron Bridge will deliver a premium product with an iron content of 67%.
Potential Job Creation
Since the investment decision in April 2019, more than 12.8-million work hours have culminated in the design and construction of the mine, pipelines, village and infrastructure at Iron Bridge, supporting more than 3 000 jobs, with another 900 full-time jobs to be created when the project moves into operations. There are currently 3 470 people working across the ore-processing facility and pipelines scope of work.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
$3.9-billion.
Planned Start/End Date
First ore is scheduled for the March quarter of 2023.
Latest Developments
FMG has produced its first magnetite product, after having its maiden production postponed, in addition to suffering significant cost blow-outs.
The project’s first run rate produced grades greater than 68% iron, with the concentrate now being transported through the 135 km specialist slurry pipeline, with dewatering and materials handling at Port Hedland creating a high-grade magnetite product, ready to be shipped and suitable for steelmaking.
Key Contracts, Suppliers and Consultants
NRW Holdings (bulk earthworks); and SIMPEC (wet processing plant construction).
Contact Details for Project Information
FMG, tel +61 8 6218 8888.
Formosa Steel, tel +886 2 2712 221.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation