https://newsletter.mw.creamermedia.com
Construction|Crushing|Gold|PROJECT|Projects|Resources|Environmental
Construction|Crushing|Gold|PROJECT|Projects|Resources|Environmental
construction|crushing|gold|project|projects|resources|environmental

Rio2 secures $50m from Wheaton for Chile gold project

4th November 2025

By: Creamer Media Reporter

     

Font size: - +

Toronto-listed Rio2 has received a final $50-million deposit from Wheaton Precious Metals to advance construction of its Fenix gold project in Chile, one of the largest undeveloped gold oxide, heap leach projects in the Americas.

The payment marks the fourth and final tranche under a precious metals purchase agreement and flexible pre-pay arrangement originally announced in 2021, Rio2 said.

The $235-million Fenix gold development will be a run-of-mine heap leach operation, avoiding the need for crushing or tailings facilities to minimize its environmental footprint. The project, located in Chile’s Atacama region, is expected to generate about 1 200 jobs during construction and 550 positions once in operation over its 17-year mine life.

Fenix hosts measured and indicated resources of 4.8-million ounces of gold, according to a 2023 feasibility study filed under Canada’s National Instrument 43-101 standards.

Rio2 said the latest funding from Wheaton would support ongoing mine construction activities as the company targets first gold production under a staged development plan.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

Resources Watch
Resources Watch
24th February 2026

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.245 0.354s - 129pq - 2rq
Subscribe Now